Fitness · 2024

An operator whose platform needed two people to operate it

6 min read
Programme building, member progress and billing, operated by coaches rather than admins

The operator had bought a capable platform and then hired two administrators to operate it, because no coach could. Every programme change, every billing question and every new member passed through those two people, who became the bottleneck and the single point of failure at once. We rebuilt the parts coaches touch so that a coach is the operator, and the administrative layer stopped being necessary rather than being made more efficient.

The Client

An operator whose platform needed two people to operate it

Anonymised · NDA
  • Fitness · 12k members
  • Egypt · United Arab Emirates

Coaches knew exactly what a programme should contain and could not enter one without help. The platform modelled a programme as a configuration object with forty fields, most of them irrelevant to any given coach, so the only people fluent in it were the two who used it all day.

Diagnosis

What was broken

  1. [01]

    A programme was forty configuration fields, of which a given coach needed about six.

  2. [02]

    Member progress lived in the coach notebooks, so it left when the coach did.

  3. [03]

    Billing questions reached an administrator because no coach could see a member ledger.

  4. [04]

    A paused membership was a manual process, so pauses were recorded late or not at all.

  5. [05]

    Two administrators held the operating knowledge and neither could take leave at once.

  6. [06]

    Nothing recorded how long a change took, so the bottleneck was argued about, not measured.

Business Impact

A programme change took three days on average, almost all of it waiting for an administrator rather than making the change. Coaches stopped asking for small adjustments, which is the expensive part: the product quietly became less personal than the business believed it was.

Why previous attempts failed

Previous work added training and documentation for the existing screens. The screens were not confusing; they asked for information a coach does not have, which no amount of training supplies.

Our Approach

How we solved it

Phase 01 of 04 · Time the bottleneck

  1. 01

    Time the bottleneck

    We instrumented the existing flow before changing it, timestamping each request from the moment a coach asked to the moment the member saw the change. The median was three days and the working time inside it was eleven minutes, which settled an argument that had run for a year.

    Deliverables

    • Request timing across the existing flow
    • Median wait against median working time
    • The six fields coaches actually set
  2. 02

    Make the coach into the operator

    A programme stopped being forty fields and became a template plus the six things a coach varies. The other thirty-four became defaults owned by the operator rather than decisions pushed onto whoever happened to be filling the form, which is what made the screen usable without training.

    Deliverables

    • Programme templates owned by the operator
    • Six coach-facing fields, the rest defaulted
    • Member ledger visible to the assigned coach
  3. 03

    Put progress in the system

    Member progress moved out of notebooks and into records attached to the member, so a handover between coaches stopped losing history. Pauses, restarts and plan changes became events with dates rather than states someone remembered to update, which is also what made billing agree with reality.

    Deliverables

    • Progress records attached to the member
    • Pause and restart as dated events
    • Coach handover that keeps the history
  4. 04

    Retire the middle layer

    Both administrators moved to member-facing work rather than being replaced, which was the point: the role existed to translate between coaches and a system, and the translation was no longer needed. Coach setup now takes under ten minutes with no one else involved.

    Deliverables

    • Coach onboarding with no administrator
    • Runbooks and an on-call path they own
    • Cloud and repository accounts in their name
  5. End of approach

    Scroll on for the results →

Scroll · 4 phases · pinned

Tech Stack

Tools & technologies

  • TypeScript · Node

    Language

  • PostgreSQL · Drizzle

    Data

  • Next.js App Router

    Interface

  • Terraform · Actions

    Infrastructure

Results

Quantified outcomes

  • < 10 min

    Coach setup, unaided

    Down from a three-day median, almost all of which was spent waiting

  • 12k

    Members on the platform

    Each with a progress record that survives a coach handover

  • 0

    Administrators needed

    Both moved to member-facing work rather than being replaced

  • 6

    Fields a coach sets

    The other thirty-four became operator-owned defaults

Key Takeaways

What we learned

  1. 01

    Training cannot supply missing information

    The screens were not confusing. They asked a coach for thirty-four decisions a coach has no basis to make, and no amount of documentation changes that. The fix was moving those decisions to whoever actually owns them.

    Useful when: Whenever a usability problem has survived two rounds of training.

  2. 02

    Measure the waiting, not the working time

    Three days of elapsed time contained eleven minutes of work. Optimising the eleven minutes was the obvious project and would have been worthless; the whole of the cost was in the queue, and the queue existed because of who had to be involved.

    Useful when: Any process complained about as slow where the work itself is quick.

  3. 03

    A default is a decision with an owner

    Thirty-four fields did not disappear; they became defaults the operator sets once and changes deliberately. That is a stronger position than the original, because the decision is now made by someone qualified instead of by whoever opened the form.

    Useful when: Simplifying any form that grew a field per edge case over time.

  4. 04

    Removing a role is not removing the people

    Both administrators moved to member-facing work. Saying so at the start is what made them willing to describe the job precisely, and their description is where the six-field model came from. A hostile source would have produced a worse product.

    Useful when: Automating work whose current owners you still need to learn from.

FAQ

Frequently asked

01What happens when a coach genuinely needs a non-default field?

They request a template rather than an exception, and the operator adds one. That keeps the variation in a named, reusable place instead of in an individual programme, which is also why the template count is a useful signal: if it grows quickly, the six-field model is wrong and we would want to know.

02How was the three-day median actually established?

By instrumenting the existing flow before changing anything: each request was timestamped when a coach raised it and again when the member saw the result. The eleven minutes of working time inside it came from the administrators’ own system timestamps, not from asking them to estimate.

03Did the two administrators lose their jobs in this project?

No, and that was agreed before the work started. Both moved to member-facing roles. It is also the practical reason the project worked: they described the job precisely because they were not defending it, and the six-field model came directly out of those conversations.

04Why rebuild rather than configure the platform they had?

Only the coach-facing parts were rebuilt; billing and scheduling stayed. The programme editor could not be configured into a six-field form because the platform treated all forty as required inputs, with no concept of a default owned by anyone other than the person filling it in.

05Why is this case study anonymised rather than named?

Member counts and staffing changes are commercially sensitive, and the engagement was covered by a mutual confidentiality agreement. The architecture, the sequencing and the numbers are reported exactly; the name is not.

The closing thought

Ready to write yours?

Every project on this site started as an operational problem somebody had stopped expecting to fix. If one of yours sounds like this, that is the conversation to have.

Edition № 003Case Study · Fitness · 2025

Let's write yours.

Book a call
  • < 10 min Coach setup, unaided
  • 12k Active members on the platform
  • SiaSol · siasol.ai
View all